Skip to content

Construction & Renovation

Less in the bin. More back on the job.

Renovation debris, offcuts, fixtures and materials, sorted on the way out so usable pieces get a second life and the rest goes to the right recycling stream.

Pallets and building materials stacked beside a job site

What we see on sites like yours

  1. 01

    Wood offcuts & framing

    Clean wood is routed for reuse or recycling, not buried.

  2. 02

    Fixtures & fittings

    Doors, cabinets, sinks and lighting assessed for reuse.

  3. 03

    Metal

    Separated for metal recycling.

  4. 04

    Stone & tile

    Bulk stone handled with the right equipment.

  5. 05

    Delivery packaging

    Pallets, cardboard and wrap, cleared regularly.

How we help

  • One-time clear-outs

    End-of-phase or end-of-job cleanups, booked around your schedule.

  • Recurring site pickups

    Regular visits during long projects so the site stays safe and clear.

  • Sorted, not dumped

    We separate materials so they can be reused or recycled.

  • Records for your client

    Diversion records you can share with owners who have green building goals.

Real example

Granite with a second life

Heavy granite slabs that could have been crushed were repurposed as warehouse mounting surfaces instead.

See more reuse stories

Questions we hear

For many jobs, yes. We haul and sort instead of leaving a bin on site. On larger projects we can work alongside your existing bins.

We set them aside for reuse. Only what has no second life goes to landfill.

Yes. Recurring pickups during a project keep debris from building up.

Yes. Homeowners can book through the app, and contractors can request a business quote.

Case study, Winnipeg, MB

Proof from a real job: Magellan Aerospace.

Stacked wooden crates

A full building clear-out of crates and granite, with nothing sent to landfill.

  • 120 wooden crates with lids: reused as sea-cargo packaging
  • 6 granite slabs: repurposed as warehouse mounting surfaces
wooden crates with lids
120
granite slabs, forklift-only
6
material kept out of landfill
30.8 t
reused locally
100%
“Our operations manager will be especially happy to hear the granite tables didn't just get crushed up!”
Environmental Operations, Magellan Aerospace, Winnipeg
Read the full case study

Tell us what's going. We'll quote it properly.

A few details and we’ll come back with a quote, or a time to see your site first.

Prefer to talk?

What needs to go? *
How often? *
Need a certificate of diversion?
PO required?

For example: 20 pallets, a half truck, one room

Access, loading dock, forklift on site, timing.

We’ll get back to you shortly.